QA/QC Reports
Analytics and quality metrics across all projects and design stages.
94%
Overall QA Score
β +2.3% this month
8
AI Reviews Completed
Total Tokens: 33,100
12
Open Non-Conformances
Resolved: 0
$0.0199
AI Cost (OpenAI)
Real-time calculations
Projects by Design Stage
Discipline Compliance Scores
Architecture
96%
Structure
98%
Mechanical
91%
Electrical
89%
Fire Fighting
95%
Landscape
87%
Infrastructure
82%
Interior
93%
Non-Conformance Log
Database Active
| # | Description | Discipline | Stage | Severity | Status | Action |
|---|---|---|---|---|---|---|
| NC-001 | Fire exit width below NFPA 101 minimum (0.18m actual vs 0.2m required) | Architecture | Detailed Design | High | active | |
| NC-002 | Missing smoke detector coverage in corridor B2 | Fire Fighting | Schematic Design | High | review | |
| NC-003 | HVAC duct sizing non-compliant with ASHRAE 62.1 | Mechanical | Detailed Design | Medium | active | |
| NC-004 | Structural beam rebar missing in column C4 drawing | Structure | Detailed Design | High | active | |
| NC-005 | Landscape grading slope exceeds 3% accessibility limit | Landscape | Tender Design | Low | pending | |
| NC-006 | Electrical load schedule totals mismatch panel board | Electrical | Detailed Design | Medium | review | |
| NC-001 | Fire exit width below NFPA 101 minimum (0.18m actual vs 0.2m required) | Architecture | Detailed Design | High | active | |
| NC-002 | Missing smoke detector coverage in corridor B2 | Fire Fighting | Schematic Design | High | review | |
| NC-003 | HVAC duct sizing non-compliant with ASHRAE 62.1 | Mechanical | Detailed Design | Medium | active | |
| NC-004 | Structural beam rebar missing in column C4 drawing | Structure | Detailed Design | High | active | |
| NC-005 | Landscape grading slope exceeds 3% accessibility limit | Landscape | Tender Design | Low | pending | |
| NC-006 | Electrical load schedule totals mismatch panel board | Electrical | Detailed Design | Medium | review |